Workload and saturation: recognize overloads before deliveries

A list of open tasks does not by itself show whether a person can do them in the expected time frame. Workload and saturation allow you to read the plan through the relationship between load and availability.

EDU and project workload

  1. Open Workload from the project or EDU and check the given context. The two views aggregate work with different perspectives.
  2. Set the period and available filters, then check the people or units included in the list. Compare data expressed in the same units.
  3. For a critical line, open the intended detail and identify which activities or associations contribute to the value.
  4. Compare load with availability, absences and assignments. A high value is a signal to be analyzed and does not in itself demonstrate an application error.

Resource saturation in the Gantt

  1. From your project, open Resource Phasing or the Predicted Saturation view. Check the resource and range displayed before reading the grid.
  2. Examine the distribution over dates and compare people. Colors and quantities must be read together with the calendar and configured availability.
  3. For a peak, trace the assigned activities and overlaps. Also check for any commitments on other accessible projects.
  4. Consider a different assignment or authorized rescheduling, then compare the result again. Don’t artificially increase availability to make the problem go away.

Putting this into practice

When a spike emerges, identify the activities that generate it before redeploying them. After a change, re-read the load to verify that the problem hasn’t just moved.

Learn more about Orchestris.

Comments and questions

Do you have a question about this topic? Open the discussion with a comment.

Leave a question or comment

Comments are moderated before publication. The email address is not published. Do not enter credentials or confidential data.

Video preferences

YouTube and Vimeo videos remain blocked until you choose. You can allow them individually from the lesson or remember your preference for all external videos here. The choice lasts 6 months and can be changed.

Questa impostazione riguarda i video gestiti da TechCo Content. Le preferenze di eventuali altri servizi del sito vanno gestite separatamente.